MANDURIA // PV PLANT EXPERIMENTAL TESTS

ground mounted grid connected 5,2 MWp

Master Tech Ingegneria conducted a study to evaluate the benefit introduced by an intervention of replacement of some components within the stringboxes in a power plant of 5,2 MW, located in Manduria(TA).
Thermographic inspections had highlighted a recurring overtemperature of some components installed in the stringboxes.
After identifying the problem, MTI decided to propose some technical improvements to reduce the overtemperature and to guarantee a better thermal dissipation of the stringboxes.
MTI studied the interventions efficacy by experimental tests.
MTI set up a specific monitoring system to evaluate the effectiveness of the proposed solutions and to check if their implementation improves the stringboxes thermal state.

Technical advisory ed asset management